Autor
|
Titel
|
Jahr
|
Band Seite
|
|
|
|
|
|
|
Mazzorana B. and Scherer C. |
ADVANCED SCENARIO-BASED HAZARD ANALYSIS IN PRACTICE |
2012 |
EA 268 - 269 |
|
Mazzorana B., Fuchs S. and Keiler M. |
A DECISION-THEORETIC APPROACH TO IDENTIFY OPTIMAL RISK MITIGATION STRATEGIES |
2012 |
EA 266 - 267 |
|
Matsui M., Ikeya H., Michihata R. and Suzuki T. |
EVALUATION BY NUMERICAL SIMULATION OF DEBRIS FLOW DISASTER OCCURRING WITH EARTHQUAKE |
2012 |
EA 264 - 265 |
|
Mathys N. and Peteuil C. |
SYNTHESIS AND ANALYSIS OF FLOOD DATA FROM MOUNTAIN TORRENTIAL WATERSHEDS IN THE FRENCH ALPS |
2012 |
EA 262 - 263 |
|
Mathys N. and Klotz S. |
HYDROLOGY AND EROSION PROCESSES IN SMALL MOUNTAIN CATCHMENTS: 25 YEARS OF OBSERVATION IN THE DRAIX EXPERIMENTAL SITE (FRENCH SOUTHERN ALPS) |
2012 |
EA 260 - 261 |
|
Al-Rawas G., Valeo C., Kohl B. and Kirnbauer R. |
RAINSTORM CHARACTERISTICS IN OMAN AND AUSTRIA |
2012 |
EA 26 - 27 |
|
Margreth S. and Baumann R. |
HANDLING OF STONE WALLS AND EARTH TERRACES IN AVA-LANCHE STARTING ZONES - TECHNICAL GUIDELINE FOR OPTIMAL MAINTENANCE STRATEGIES |
2012 |
EA 258 - 259 |
|
Marco O. |
RELIABILITY OF AVALANCHE PROTECTION STRUCTURES |
2012 |
EA 256 - 257 |
|
Manin O. |
THE "ISERE AMONT" PROJECT BETWEEN PONTCHARRA AND GRENOBLE |
2012 |
EA 254 - 255 |
|
Mani P. and Dobmann J. |
EARLY WARNING SYSTEM FOR SMALL CATCHMENTS - A DISPOSITION APROACH |
2012 |
EA 252 - 253 |
|
Mair V., Zischg A. and Lang K. |
CONSIDERATION OF PERMAFROST AND PERMAFROST DEGRADATION IN NATURAL HAZARDS AND RISK ASSESSMENT |
2012 |
EA 250 - 251 |
|
Mair R., Nairz P. |
AVALANCHE DANGER PATTERNS - A NEW APPROACH TO SNOW AND AVALANCHE SCIENCE |
2012 |
EA 248 - 249 |
|
Lussi D., Meier L. and Baumann R. |
REMOTE DETECTION OF SNOW AVALANCHES |
2012 |
EA 246 - 247 |
|
Lucarelli C. and Gostner W. |
AN INNOVATIVE APPROACH FOR HAZARD ASSESSMENT AT DIKED RIVERS |
2012 |
EA 244 - 245 |
|
Loye A., Theule J., Li‚bault F. and Jaboyedoff M. |
GEOMORPHIC MONITORING OF AN ACTIVE DEBRIS-FLOW TORRENT - THE CASE OF THE MANIVAL TORRENT CATCHMENT |
2012 |
EA 242 - 243 |
|
Loup B., Egli T., Stucki M., Bartelt P., McArdell B. and Baumann R. |
IMPACT PRESSURES OF HILLSLOPE DEBRIS FLOWS - BACK-CALCULATION AND SIMULATION (RAMMS) |
2012 |
EA 240 - 241 |
|
Adams M. S. |
REGIONAL RISK DIALOGUE - AN EFFECTIVE TOOL FOR NATURAL HAZARD MANAGEMENT AND RISK COMMUNICATION? - A CASE STUDY IN THE STANZER VALLEY, TYROL |
2012 |
EA 24 - 25 |
|
Liener S., Gsteiger P. and Hauser M. |
AN APPROACH TO QUANTIFY NATURAL HAZARD-RELATED RISKS ON THE SWISS RAILWAY NETWORK |
2012 |
EA 238 - 239 |
|
Liener S., Caduff U. and Roth H. |
FIXING DESIGN FLOOD CONSIDERING - FLOOD EVENT CYCLE AND THRESHOLD PROCESSES |
2012 |
EA 236 - 237 |
|
Leutwiler A., Egli T., Wyser G., Aller D. and Baumann M. |
RISK DIALOGUE ON NATURAL HAZARDS - ACTION PLAN ON RISK DIALOGUE TO PROMOTE PREVENTIVE MEASURES |
2012 |
EA 234 - 235 |
|
Leber D., Schnetzer I. and Kollarits S. |
SCENARIO MODELS AS A LINK BETWEEN HAZARD MAPPING AND CONTINGENCY PLANNING |
2012 |
EA 232 - 233 |
|
Le Coz J., Dramais G., Benmamar D. and Gallavardin A. |
FLOOD DISCHARGE MONITORING USING IMAGE ANALYSIS - IMPLEMENTATION AND EVALUATION OF PERMANENT STATIONS |
2012 |
EA 230 - 231 |
|
Lamovec P., O_tir K. and Miko_ M. |
FLASH FLOODS AND PEAK DISCHARGE ESTIMATION - THE SEL_KA SORA RIVER FLASH FLOOD IN SEPTEMBER 2007, W SLOVENIA |
2012 |
EA 228 - 229 |
|
Laimer H. J., Mllegger M., Lenz G. and Brauner M. |
THE DšRNSTEIN ROCKSLIDE (WACHAU, LOWER AUSTRIA) - IMPLEMENTATION OF PROTECTIVE MEASURES WHILE MAINTAINING PUBLIC TRANSPORTATION - A CASE STUDY |
2012 |
EA 226 - 227 |
|
Lafarge N., Chambon G., Thouret J.-C., Laigle D. |
MONITORING AND MODELLING LAHAR FLOWS AT SEMERU VOLCANO (JAVA, INDONESIA) |
2012 |
EA 224 - 225 |
|
Kuraoka S. |
NUMERICAL SIMULATION OF NATURAL LANDSLIDE DAM - PREDICTING THE HEIGHT OF THE DAM FOR THE PURPOSE OF ESTIMATING THE PEAK DISCHARGE IN CASE OF DAM BREAK |
2012 |
EA 222 - 223 |
|
Kreisler A., Moser M., Seitz H., Rudolf-Miklau F. and Habersack H. |
BEDLOAD TRAP MEASUREMENTS AS PART OF AN INTEGRATIVE MEASUREMENT SYSTEM |
2012 |
EA 220 - 221 |
|
Kogelnig B., Egginger T., Oismüller M., Schraml C., Wolfsgruber M., Schneuwly-Bollschweiler M., Stoffel M., Gobiet A., Sinabell F. and Kaitna R. |
ASSESSMENT OF CLIMATE CHANGE IMPACTS ON TORRENT DISASTERS - THE ACRP DEUCALION PROJECT |
2012 |
EA 218 - 219 |
|
Koboltschnig G., Korber S., Sereinig N. and Stickler T. |
RISK DIALOG AS AN ESSENTIAL PART OF THE INTEGRAL FLOOD RISK MANAGEMENT - EXPERIENCES FROM AN AUSTRIAN CASE STUDY |
2012 |
EA 216 - 217 |
|
Klose M., Damm B., Terhorst B., Schulz N. and Gerold G. |
ECONOMIC LOSS BY LANDSLIDES - DEVELOPMENT OF AN EMPIRICAL CALCULATION MODEL WITH REGIONAL APPLICATION TO GERMAN SUBDUED MOUNTAINS |
2012 |
EA 214 - 215 |
|
Klebinder K., Sotier B., Eder A. and Strauss P. |
HYDROLOGICAL SOIL MAPPING LOWER AUSTRIA - AN APPROACH FOR HYDROLOGICAL SOIL CLASSIFICATION AND RUNOFF ASSESSMENT |
2012 |
EA 212 - 213 |
|
Kister, B. Zimmermann M., Hunziker G., Zimmerli B. and Fellmann W. |
ANALYSIS OF TORRENT PROTECTIVE STRUCTURES AS A BASIC ELEMENT OF THE HAZARD MAPPING PROCESS - DETERMINING THE AS-IS-STATE OF 100 YEARS OLD CHECK DAMS MADE OF NATURAL STONE MASONRY |
2012 |
EA 210 - 211 |
|
Kipfer A., Kienholz C. and Liener S. |
A NEW APPROACH TO MODEL OVERLAND FLOW |
2012 |
EA 208 - 209 |
|
Kern K., Lieb G. K., Seier G., Strasser U. and Kellerer-Pirklbauer A. |
GEOMORPHOLOGICAL HAZARD CAUSED BY CLIMATE CHANGE AND ITS IMPACTS ON HIKING TRAILS AND ROUTES - A CASE STUDY FROM THE GROSSGLOCKNER-PASTERZE GLACIER AREA (HOHE TAUERN/AUSTRIA) |
2012 |
EA 206 - 207 |
|
Keiler M. and Kappes M. S. |
MULTI-HAZARD RISK ANALYSES - CHALLENGES OF INTERACTION AND CONNECTIVITY |
2012 |
EA 204 - 205 |
|
Karagiorgos K., Chiari M. and Huebl J. |
FLOOD HAZARD ASSESSMENT VALIDATION BASED ON THE FLOOD RISK DIRECTIVE 2007/60EU - A CASE STUDY IN RAFINA (ATTICA, GREECE) CATCHMENT |
2012 |
EA 202 - 203 |
|
Kappes M. S., Frigerio S., Gruber K. and Glade T. |
MULTI-HAZARD RISK ANALYSES WITH MULTIRISK - TOOLS FOR A USER-FRIENDLY PERFORMANCE |
2012 |
EA 200 - 201 |
|
Jordan J.-P. and Arborino T. |
FLOOD RISK AND ITS MANAGEMENT OVER A LARGE AREA: THE RHONE PLAIN UPRIVER FROM LAKE GENEVA |
2012 |
EA 198 - 199 |
|
Granig M. and Joerg P. |
A DYNAMIC APPROACH TO EVALUATE THE DENSE AND POWDER SNOW AVALANCHE MODEL SAMOS-AT |
2012 |
EA 196 - 197 |
|
Mateja Jemec and Marko Komac |
IMPACT OF ANTECEDENT RAINFALL ON SHALLOW LANDSLIDES |
2012 |
EA 194 - 195 |
|
Javelle P., Defrance D., Mériaux P., Liébault F., Navratil O., Segel V. and Westrelin S. |
FLASH FLOOD WARNING SYSTEM IN MOUNTAINOUS AREAS USING X-BAND WEATHER RADARS - SOME PRELIMINARY RESULTS OBTAINED IN THE FRAMEWORK OF THE "RHYTMME"" PROJECT" |
2012 |
EA 192 - 193 |
|
Jarrin, J.-P., Verdier J.-M. and Meignan L. |
A DETERMINATION METHOD FOR ROCKFALLS HAZARD APPLIED TO INHABITED AREAS PROTECTIONS AND ENGINEERING CONTRUCTIONS |
2012 |
EA 190 - 191 |
|
Jancke O., Berger F. and Huguenin J. |
INNOVATIVE REAL-SIZE TESTS FOR ASSESSING THE MECHANICAL RESISTANCE OF COPPICE STEMS AGAINST ROCKFALL - THE PARTICULARITIES OF ROCKFALL AGAINST COPPICE CLUMPS |
2012 |
EA 188 - 189 |
|
Jaeger D., Sandmeier C. and Terhorst B. |
LANDSLIDES AND SLOPE STABILITY ON THE FRANCONIAN ALB, NORTHERN BAVARIA |
2012 |
EA 186 - 187 |
|
Ishikawa Y. and Ishikawa T. |
CHARACTERISTICS OF SLOP FAILURES AND LANDSLIDE DAMS CAUSED BY THE 2008 IWATE-MIYAGI NAIRIKU EARTHQUAKE |
2012 |
EA 184 - 185 |
|
Huttenlau M. and Stötter J. |
NATURAL HAZARD RISK ANALYSES ON REGIONAL SCALES - METHODOLOGICAL CHALLENGES REGARDING INTEGRATIVE AND CONSISTENT WORKFLOWS AND APPRAOCHES TO ANALYSE THE MONETARY VALUE OF THE EXISTING BUILDING STOCK |
2012 |
EA 182 - 183 |
|
Hunzinger L., Olbrecht E. and Durrer S. |
BANK EROSION IN THE BÜNZ FLOODPLAIN: MANAGEMENT BASED ON THE RISK CONCEPT |
2012 |
EA 180 - 181 |
|
Hunzinger L., Durrer S. and Utelli H.-H. |
SHARING THE COSTS FOR PROTECTIVE MEASURES BASED ON A RISK ANALYSIS - AN EXAMPLE |
2012 |
EA 178 - 179 |
|
Huber A. |
COMPARISON OF 2-D DEBRIS FLOW SIMULATION MODELS - IMPLICATIONS FOR PRACTICAL MODEL APPLICATION TO HAZARD ASSESSMENT FOR ALPINE TRANSPORT INFRASTRUCTURE |
2012 |
EA 176 - 177 |
|
Hohl P., André S., Davoli C.-A. and Chatelain Y. |
INTEGRATED WATERMANAGEMENT OF THE GRANDE EAU CATCHMENT BASSIN IN SWITZERLAND FOR SUSTAINABLE PROTECTION WORKS |
2012 |
EA 174 - 175 |
|